Hazard Level C Pressure Vessel Registration Deadline: March 31, 2025 – What You Need to Know

facebook linkedin

If you own or operate any registered plant in Western Australia, staying compliant with the updated regulations is crucial to avoid penalties and ensure workplace safety. The WA Work Health and Safety (WHS) Regulations 2022 have strict guidelines for the registration of pressure vessels based on their hazard levels, as defined in AS 4343:2014.

Among these, pressure vessels with a Hazard Level ‘C’ must be registered by the 31 March 2025. Here’s everything you need to know about this deadline and how AME can assist you.

Understanding the WA WHS Regulations 2022

The updated regulations introduced, enhance safety standards in mining, and other industries. The requirements for pressure vessels with a Hazard Level of A, B, or C need to be registered with the WA Department of Mines, Energy, Industry Regulation and Safety (DEMIRS).

  • Hazard Level A & B Vessels: Registration deadlines have already passed. If these assets remain unregistered, they are now non-compliant, requiring immediate attention.
  • Hazard Level C Vessels: Registration must be completed by 31 March 2025.

Why are Pressure Vessel Registrations Important?

Pressure vessels are a critical safety asset in any important operation, but their failure can result in catastrophic incidents, including property damage, injuries, or fatalities. Registration ensures:

1. Compliance with Safety Standards: Protects employees and assets while meeting legal obligations.

2. Ongoing Maintenance Accountability: Encourages adherence to inspection and maintenance schedules.

3. Avoidance of Penalties: Non-compliance may lead to fines, legal action, or operational downtime.

What Are Hazard Levels?

The classification of a hazard level, as defined by AS 4343:2014, determines the risks associated with a pressure vessel’s operation.

  • Hazard Level A: High-risk, requiring immediate attention.
  • Hazard Level B: Medium risk, overdue for registration in WA.
  • Hazard Level C: Lower risk, but still significant.

While hazard level C vessels pose a lower risk compared to A or B, they still require registration under the new regulations to ensure safe operation.

Key Steps to Meet the 31 March 2025 Deadline

If you own or operate a hazard level C pressure vessel, here’s what you need to do to stay compliant:

1. Identify and Classify Your Pressure Vessels: Ensure your assets are classified correctly according to AS 4343:2014.

2. Conduct Inspections: Pressure vessels must undergo a registered plant inspection in accordance with AS3788 to confirm they meet the required safety and operational standards of AS1210.

3. Prepare Documentation: Gather all required technical and safety data information for plant registration, such as a Design Registration certificate and the Manufactures’ Data Report.

4. Submit Plant Registration to DEMIRS: Complete the application process with the WA Department of Mines, Energy, Industry Regulation and Safety.

5. Ensure you have marked the approved plant registration number on the pressure vessel.

How AME Can Help

As a leading provider of registerable plant inspections in Western Australia, AME is well-equipped to assist you in meeting the pressure vessel registration requirements. Our team provides:

  • Expert Inspections: Comprehensive evaluations to ensure your assets meet compliance standards.
  • Documentation Support: Assistance with preparing and submitting required paperwork to DEMIRS, along with taking care of the full end-to-end process.
  • Compliance Advice: Guidance on aligning your operations with the latest WHS regulations.

With years of experience and a strong focus on safety, AME is your trusted partner for navigating these regulatory changes.

The Clock Is Ticking – Act Now

The 31st of March 2025 deadline for the hazard level C pressure vessel registration is fast approaching. Avoid any last-minute compliance issues by acting now. Whether you’re managing a large mining operation or a smaller industrial site, ensuring compliance is vital for the safety of your team and the continuity of your operations.

Contact AME today to schedule an inspection, gap analysis, or to learn more about how we can assist with your pressure vessel registration needs.